Redondo Beach Public Works

Redondo Beach Public Works Official page of Redondo Beach Public Works Department.

Providing the highest quality maintenance, construction, and operations of the public facilities, projects, and programs under our care.

09/02/2026

Check out the new striping on Flagler Lane!

🚧This work was part of the Citywide Slurry Seal Project, Job No. 41140

📲To learn more about the traffic impacts of upcoming CIP projects, visit Redondo.org/TrafficImpacts

08/27/2026

Residential Street Rehabilitation Project, Cycle 2, Phase 5 (Job No. 40190)

Calmex Engineering, Inc. has been contracted by the City of Redondo Beach to perform the Residential Street Rehabilitation Project, Cycle 2, Phase 5. The work includes pavement rehabilitation, curb and gutter replacement, sidewalk and ADA ramp improvements, street lighting upgrades, and related drainage, signing, and striping work.

🚧 Upcoming Work (Week of August 24 through September 18, 2026)
 
📍North Redondo (Blossom, Huntington, Marshallfield, Harriman, Perkins, Rockefeller, Carnegie, Vanderbilt, Ruxton, & Firmona Alley):
• Concrete demolition, grading, and pouring through the week of August 24
• Asphalt cold plane (grinding) during the week of August 31
• Asphalt cap paving during the week of September 8
• Temporary striping after paving

📍 South Redondo (Maria Alley, Emerald, Irena, & Juanita):
• Sawcutting, concrete demolition, grading, and pouring through the weeks of August 31 and September 7

🪧 Public notification and “No Parking” postings will be provided at least 72 hours in advance of work that affects parking or access. All vehicles parked in the roadway during the posted times and dates will be towed. The contractor will continue concrete improvements by area and will return later for remaining roadway resurfacing where needed. Residents and properties will be re-notified before roadway work and when access is anticipated to be impacted.
 
🚛 Trash Pickup: The contractor will coordinate around trash pickup days to ensure all trash is collected on time.
 
⚠️ Traffic Impacts: There will be periodic temporary lane closures and redirection of pedestrian paths. In order to protect the workers and the fresh asphalt, temporary street closures may be utilized and alternate parking will be provided. Changeable Message Boards will be used to notify the public of upcoming work.
 
🕖 Work Hours: 7:00 A.M. to 6:00 P.M., Monday through Friday. Lane closures will generally be limited to 9:00 A.M. – 3:00 P.M.
 
📲 Check Redondo.org/TrafficImpacts for updates and more information.

08/17/2026

🚧Palos Verdes Boulevard Protected Bike Lane Construction (Citywide Slurry Seal Project)

📍Palos Verdes Blvd (from PCH to S Irena Ave)
Concrete Curb Installations, 8/17-8/20
Final Striping and Sign Installations to follow

⚠️Expect Delays, Use Alternate Routes

📲Go to Redondo.org/TrafficImpacts for schedule updates.

Join us for the ribbon cutting ceremony for the Bill Brand Gateway Park at Herondo & PCH!📅 Tuesday, July 28, 2026⏰ 3:00 ...
07/22/2026

Join us for the ribbon cutting ceremony for the Bill Brand Gateway Park at Herondo & PCH!

📅 Tuesday, July 28, 2026

⏰ 3:00 PM

👟 Wear comfy shoes

🚗 Park along Herondo St

🔗 More info on our website at https://www.redondo.org/news_detail_T11_R425.php

Address

531 N Gertruda Avenue
Redondo Beach, CA
90277

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 4pm

Alerts

Be the first to know and let us send you an email when Redondo Beach Public Works posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share