08/28/2026
500 West is missing sidewalks, has inadequate storm drains, failing asphalt, and less shade. This corridor connects the 9-Line to North Temple and several key downtown destinations in Salt Lake City. There are dozens of local businesses here and 3,000 housing units. We need to address these issues and have a new concept plan to improve the area and prepare for growth, prioritizing The Granary District section. Share your feedback with us: https://shape.slc.gov/en/projects/500west
If you've been to the Granary District, you know 500 W.
500 West connects several important downtown destinations and is becoming increasingly important as the surrounding area grows. The Granary District section of 500 West, between 900 South and 600 South, will be prioritized for improvements because of its rapid growth, aging infrastructure, and significant need for transportation and public realm improvements.
This project considers the long-term needs of the street, including portions where sidewalks and other pedestrian and bicycle infrastructure are incomplete or inadequate.
The project will also address:
Street and utility infrastructure, including aging infrastructure and planned reconstruction
Transportation safety for people walking, biking, driving, and taking transit
Walking and biking connections to the 9-Line, Folsom Trail, North Temple, downtown, and surrounding neighborhoods
Urban heat and shade, including expanded tree canopy and comfortable places for people to walk and gather
Stormwater and flood management
Parking and access
Long-term growth and development along the corridor
Visit the link below to take the survey and let you voice be heard as we improve this piece of Salt Lake City.
https://shape.slc.gov/en/projects/500west