🚧2026 MILLING & PAVING PROJECT🚧
The City of Sebastian has contracted with Asphalt Paving Systems, Inc. to complete roadway milling and paving. Work is scheduled by week, weather permitting, and dates are subject to change.
📅 Week of October 26, 2026
• Doctor Avenue: Roseland Road to Mulberry Street; Mulberry Street to Glencove Street; Wentworth Street to Barker Street
• Jordan Avenue: Mulberry Street to Glencove Street; Wentworth Street to Barker Street
• Foster Avenue: Wentworth Street to Barker Street
• Smith Street: Vocelle Avenue to Doctor Avenue
📅 Week of November 2, 2026
• Bywood Avenue: Seagrass Avenue to Melrose Lane
• Seagrass Avenue: Melrose Lane to Autumn Terrace
• Crown Street: Autumn Terrace to Melrose Lane
• Celtic Avenue: Melrose Lane to Crown Street
• Kendall Avenue: Melrose Lane to Crown Street
• Candle Avenue: Melrose Lane to Crown Street
• Englar Drive: George Street to the bridge to the park entrance
📅 Week of November 9, 2026
• Miller Drive: Pelican Island Drive to Barber Street
• Arcadia Drive: Barber Street to the area near Tracy Drive
• Midvale Terrace: Joyhaven Drive to Barber Street
• Midvale Terrace: Spinnaker Lane to Addie Street
📅 Weeks of November 16 and November 23, 2026
• Landsdowne Drive: Laconia Street to Wave Street
• Summer Street: George Street to Bywood Avenue
⚠️ Important Reminders for Residents:
• Remove all vehicles, boats, trailers, debris, and other items from the roadway between 7 a.m. and 7 p.m. on your scheduled paving day.
• Travel slowly, as milling may create elevation drops of up to 2 inches before new asphalt is applied.
• Expect temporary traffic delays, limited road access, and possible driveway restrictions during work hours. Access will be coordinated by on-site workers and traffic directors.
• Full road access is expected during non-working hours.
For immediate needs or questions, contact Kris Shane with Asphalt Paving Systems at 813-480-1865.