08/29/2026
Washington “wants to” keep data centers from raising your power bill.
Last session, corporations and special interests killed HB 2515, which would have required data centers to pay their own way, cut power when the grid is strained, and disclose how much electricity they use.
Meanwhile, PSE is planning billions of dollars in new power generation and storage to meet what it calls “growing demand.” A big driver of that demand? Data centers.
We talk about this demand as if it’s out of our control. It isn’t.
We shouldn’t be building power plants, batteries and other infrastructure to feed the AI slop factories before putting protections in place for consumers and our environment.
Data centers should pay the full cost of the infrastructure needed to serve them. They should be at the back of the line for new power, bring or procure clean energy, and reduce their power use when the grid is strained.
And until Washington puts real guardrails in place, cities and counties are right to use every tool available to protect their communities.
State regulators are drawing up options while fear of data centers, including their potential to strain the electrical grid, is spreading rapidly.