The good news? After many days and countless hours of work, our DPW crew has finally removed the old pipe from the fl**ge! What seemed like a simple task turned into a challenge that required chiseling, sawing, hammering, and a fair amount of determination. I can’t thank our DPW team enough for their hard work and persistence.
The new Schedule 80 pipe is on its way, and as soon as it arrives, it will be installed to replace the old pipe. This is a major step forward and brings us one step closer to opening the pool.
Now for the bad news. Yes, we know the pool is green. With the circulation system offline while repairs are being made, the water has not been able to filter and circulate properly, allowing algae to take hold. The good thing is that once the new pipe is installed and the system is back online, we can begin circulating, balancing, and treating the water. Pool water can clear up surprisingly quickly when the filtration and chemical systems are operating correctly, and we’ll be working hard to get it back to the crystal clear look we are used too!
Trust me, I am just as excited and eager as all of you to get this pipe replaced and the pool up and running. Every day brings forward progress, and we’re getting closer.
In the meantime, work around the pool grounds continues:
Bathroom trim is being painted.
Benches in the changing stalls have been sanded and given a fresh coat of paint.
The bathroom floors have received their second coat of paint.