AJAK Fire Protection LLC

AJAK Fire Protection LLC Company providing services for fire sprinkler systems, fire extinguishers, and commerical kitchen ho

Teaching the 15 year old son how to replace packings in a fire pump and add a jockey pump. This pump has needed a jockey...
07/01/2022

Teaching the 15 year old son how to replace packings in a fire pump and add a jockey pump. This pump has needed a jockey pump to keep it from starting in the middle of the night for a long time. It took the fire department threatening fines for false alarms to get the higher ups to finally go for it.

Salt air and black pipe combined with 20 year old dry system and grouting around the base of each pipe, not a good combi...
12/31/2019

Salt air and black pipe combined with 20 year old dry system and grouting around the base of each pipe, not a good combination

Nothing like pulling an all-nighter climbing around in a steamy school attic to replace rotted out dry system piping! Th...
07/04/2019

Nothing like pulling an all-nighter climbing around in a steamy school attic to replace rotted out dry system piping! This is why 5 year internal inspections are important. The last pic shows the scale buildup and debris and the pipe is rotted away to almost half the thickness. This should have been caught during an internal inspection.

Scale/sediment buildup found inside a 20 year old sprinkler system. This is why an internal pipe inspection is required ...
09/07/2018

Scale/sediment buildup found inside a 20 year old sprinkler system. This is why an internal pipe inspection is required every 5 years by NFPA

Changing a 100 year old post indicator valve
02/21/2018

Changing a 100 year old post indicator valve

Industrial Dust collector Pre-Action/dry system installation. Customer installed a CO2 system only to discover that thei...
12/29/2017

Industrial Dust collector Pre-Action/dry system installation. Customer installed a CO2 system only to discover that their baghouse was not capable of passing the 20 min dump and hold test required by the fire official. AJAK Fire was able to get the preaction system installed within a very tight timeline in order to keep the fire official from shutting down the clients production lines.

Dust Collector deluge system install
12/27/2017

Dust Collector deluge system install

Residential install in progress
05/19/2017

Residential install in progress

Whats wrong with this picture? Sprinkler head is not only too far down from the ceiling but its installed upside down so...
04/18/2017

Whats wrong with this picture? Sprinkler head is not only too far down from the ceiling but its installed upside down so it sprays water up. And this is in a school boiler room. AJAK Fire Protection fixed it even though it has been this way for probably 40 years!

Long day changing out some OLD valves that were no longer shutting. After removal, you can see why they wouldnt seal shu...
04/08/2017

Long day changing out some OLD valves that were no longer shutting. After removal, you can see why they wouldnt seal shut. A 4" valve isnt 4" inside anymore! This is why NFPA requires you to internally inspect your fire system every 5 years!

Address

716 Main Avenue
Vineland, NJ
08360

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Website

Alerts

Be the first to know and let us send you an email when AJAK Fire Protection LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share