Town of York, Maine Department of Public Works

Town of York, Maine Department of Public Works Official Page of the Department of Public Works for the Town of York, Maine.

The Department of Public Works (DPW) plans and provides for the management, maintenance, repair and capital improvement, for much of the Town of York's infrastructure. Most of the Department’s responsibilities can be grouped into the following work categories: Multi-Modal Transportation; Stormwater Management; Buildings and Structures; Vehicles and Equipment; Traffic Control; Municipal Solid Waste and Recycling; Right of Way Management and Town Engineering Support Services.

08/27/2026
This week DPW installed a new stop sign at the intersection of Southside Road and Seabury Road. After checking the site ...
08/26/2026

This week DPW installed a new stop sign at the intersection of Southside Road and Seabury Road.
After checking the site for best visibility, crew members use a weighted, mechanized post driver from our crane truck to drive the signpost securely into the ground. Then, a brand-new stop sign that’s made at our Route One facility was attached.
Another routine installation with minimum traffic disruption with the added benefit of increased traffic safety.

This week, extensive work continues around Winterbrook Drive area with the replacement of old and failing cross culverts...
08/14/2026

This week, extensive work continues around Winterbrook Drive area with the replacement of old and failing cross culverts. After excavation, the aging metal culverts are removed and replaced with long-lasting plastic culverts.
Additionally, to help improve drainage, heavy equipment is brought in to remove built up sediment and vegetation in and around the ditches. This type of work is critical to ensure proper, year-round drainage and must be completed before future road resurfacing.
Motorists are cautioned to be aware of crews and equipment moving throughout this area into next week.

This week two new International HV-508, six-wheel heavy duty trucks were completed and readied to begin service among th...
07/31/2026

This week two new International HV-508, six-wheel heavy duty trucks were completed and readied to begin service among the DPW fleet of trucks. When delivered over the winter they were just cabs and open chassis. Since then, dump bodies, wiring harnesses, emergency lights, radios, mechanical sub-systems, as well as custom plow and wing attachments were added.
Each truck is custom built to meet the rugged demands of year-round service. From hauling rocks, dirt and debris in summer to spreading salt and plowing snow in the winter, these trucks are the backbone of DPW service. Both were purchased with the approval by voters in the last two May budget referendums

Just a friendly reminder to York residents…A permit sticker is required to access the York Transfer Station and Compost ...
07/30/2026

Just a friendly reminder to York residents…
A permit sticker is required to access the York Transfer Station and Compost Facility located at 65 Witchtrot Road. The cost is $25.00 annually for residents and $100.00 annually for commercial stickers. The Permits are valid from July 1st – June 30th.
The recycling facility accepts: White goods or appliances, Air conditioners, Microwaves, Fire extinguishers, Dehumidifiers, Scrap metal, Waste oil/antifreeze, Leaves, Grass clippings, Brush, Tree wood (no stumps), Lawnmowers, Gas grills, Propane tanks
For more information, please visit https://yorkpublicworks.org

This week, work crews completed installation of new underground culverts on River Road and Donica Road. These culverts a...
07/29/2026

This week, work crews completed installation of new underground culverts on River Road and Donica Road. These culverts are vital for managing effective drainage from rain and seasonal snow melt and are being installed now before future road resurfacing takes place.

Starting July 6th, bulk items will no longer be picked up by Casella on behalf of the town.To learn how to dispose of bu...
07/04/2026

Starting July 6th, bulk items will no longer be picked up by Casella on behalf of the town.

To learn how to dispose of bulk items moving forward, please review our FAQ page:

[...]Read More...

To help control vegetation emerging from pavements, a certified licensed contractor will be applying crack and crevice h...
07/01/2026

To help control vegetation emerging from pavements, a certified licensed contractor will be applying crack and crevice herbicide throughout York through October 15, 2026. Target areas include roadside sidewalks, traffic islands, walkways and parking lots.
The herbicides used will be Sureguard SC Herbicide and Cheetah Pro Herbicide. An additional organic herbicide will be used called Finalsan Herbicidal Soap. Further information can be obtained from Municipal Pest Management Services, Inc. (603-431-0008 or [email protected]).

This Saturday the York Transfer Station and Compost Facility located at 65 Witchtrot Road will be closed due to the Four...
06/29/2026

This Saturday the York Transfer Station and Compost Facility located at 65 Witchtrot Road will be closed due to the Fourth of July Holiday.

Address

115 Chases Pond Road
York, ME
03909

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm

Telephone

+12073631010

Alerts

Be the first to know and let us send you an email when Town of York, Maine Department of Public Works posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Town of York, Maine Department of Public Works:

Shortcuts

Share