ZEMA HOLDS A 2ND PUBLIC HEARING FOR AVOCADO MINE
ZEMA today held a public hearing for Avocado Mining Limited. The mine requested the Agency to consider being granted a chance to undertake a second trial-run for the pollution abatement equipment installed after the first trial-run whose outcome was not favourable.
During the 1st Public Hearing of July 2, 2026, the community observed that Avocado had not completed the installation of the pollution abatement equipment. As a result, a resolution was reached by both the residents and the mine to allow for the mine to install equipment that was to address the issues of emissions. The submissions from the meeting as well as from various stakeholders were presented before the Environmental Assessment Committee (EAC) for consideration.
In August, 2026, Avocado communicated that they had completed the installation of pollution abatement equipment. Following this development, the EAC at its sitting resolved that another Public Hearing be convened to inform the residents of the interventions the Mine had put in place to mitigate the concerns earlier raised. ZEMA convened a second Public Hearing whose purpose was to create a platform for the Kalulushi Community, Avocado and other interest and affected parties to engage. During this engagement, Avocado had the task to present to the community all measures taken to address the air pollution which in the past had adversely affected the community around it's facility.
Today, 4th September, 2026, ZEMA held a public Hearing were the mine presented on the major pollution-control infrastructure that has been installed. Avocado Minning Limited presented that the followingiiii8 pollution abatement equipment:
-Wet scrubbers and filtration to improve gas cleaning;
-Higher Stuck configuration which is an upgrade from the previous 26m to 53 m;
-Induced -draft fans which is expected to improve gas movement through the smelting and control system;
-A new baghouse/ESP system with a larger pollution-control unit and dust-management provisions.
-A Scrubber -water and sludge controls.
-Air ducts have been repositioned above water, additional reservoir provided, and improved sludge filtration installed
-The Converter-to-scrubber bypass was removed
After its presentation, Avocado Mining Limited made an additional request to be allowed to demonstrate the performance of the improvements through a controlled trial run whilst under monitoring by representatives for the affected residents, concerned, interested parties as well as ZEMA.
As a resolution of the meeting, the residents granted Avocado Mining Limited an opportunity to conduct a trail run whilst subjecting tests to an independent internationally certified laboratory.
ZEMA facilitates for public hearings in a quest to allow for concerns from different aggrieved parties on impacts to human, plant and animal life to be addressed. This is in line with its mandate to manage the environment through sustainable practices.