09/04/2026
Part 4 of 4
During the attack on Sept 3rd 2006 the wounded and dead were brought to a hasty CCP (Casualty Collection Point).
It was set up beside the Dozer used by the Combat Engineers and was in a defendable and somewhat secure position behind the main contact at the school.
At this point WO Nolan’s body was still in the back of the abandoned LAV 31 Bravo. WO Melish came to the CCP to talk to our CSM and others to organize a retrieval party to head back and grab WO Nolan’s body. Pte Cushley was also at the CCP since his lav 31 Bravo was stuck in an anti tank ditch and recently abandoned.
A 81mm anti tank round hit the dozer and killed WO Mellish and Pte Cushley. It injured our Sgt Major, blowing out his ear drums and others that were at the CCP were also hit by shrapnel. The CCP was collapsed, wounded and dead thrown in the back of over filled LAVs and we withdrew again further out into the Arghandab for stand off.