05/29/2026
Good news! Three new GOEVIN charging sites are now online!
⚡️City Of Rensselaer, installed a dual-port Level 2 charging station (9.6kW) at Filson Park, located at 223 W. Kellner Blvd. Rensselaer, IN 47978. Electron Charger installed and provided the hardware/software for this station.
⚡️BMW of Schererville installed a dual-port Level 2 charging station (19.2kW) at their dealership located at 1400 US Hwy 41, Schererville, IN 46375. Installed by Continental Electric with hardware and software provided by ChargePoint.
⚡️The Northwestern Indiana Regional Planning Commission (NIRPC) installed a dual-port Level 2 charging station (7.2kW) at 6100 Southport Rd. Portage, IN 46368. Installed by Midwestern Electric, and universal wall connector hardware/software provided by Tesla.