Soda Springs 2nd Sth/Hwy 30 Reconstruction Project Update
As many are aware, the 2nd Sth/Hwy 30 Reconstruction project is directed and administered by the Idaho Transportation Department, (ITD). On October 29th I learned from ITD that portions of the 2nd Sth/Hwy 30 new asphalt paving west of the 3rd East intersection may not have passed inspection and may require replacement.
Thus, I arranged a meeting on November 2 with ITD, City, County and state elected officials to discuss the project. Officials attending included ITD District Engineer Don Durgin, Senator Mark Harris, Caribou County Commissioner Bryce Somsen and State Representative Mike Veile. The intent of the meeting was to get a status update on the project and to find ways to facilitate communication amongst all involved.
While many challenges over the life of the project have been identified, one has risen to the top as the most problematic at this time, that being fall weather. Fall in our area is often unpredictable and several prolonged substantial precipitation events have proven this true.
Portions of the new paving,(as of Monday, November 2, 2026) may have to be removed and replaced according to ITD representatives. Specific areas may be identified in the future. A goal reiterated several times during the meeting was that there would be at least one layer of asphalt put down before winter. Additional layers is dependent on weather.
The goal remains that the project be complete by December, however weather can change many schedules and this project is no exception. I’ve been asked many times, “Will the project continue into summer 2027?” This is a tough question to answer because November weather is unpredictable long term. In my opinion based on unpredictable weather, it is possible, but for sure, ITD has mentioned there will be at least chip sealing done next summer.
Several safety concerns were discussed as was the desire to see more maintenance of the unpaved portion during weather events. A plan was developed to increase communication and sharing of information. The City of Soda Springs remains committed to helping the project reach completion whenever possible. To this end, city staff have been very helpful to the project and I appreciate and thank them.
From what I heard in the meeting, I am of the belief that ITD is very intent on getting pavement put down before winter and making travel through Soda Springs as safe as possible. I appreciate ITD’s efforts to address my concerns and questions.
The following is a message regarding the project from Aaron Baird ITD Engineer on Tuesday November 3, 2026.
"All underground utility, curb and sidewalk work is complete. The remaining work left to be done is paving and placement of a few manhole components. The contractor has staffed up to work 7 days a week until the road has been paved completely. Weather and other issues outside of their control may cause some paving delays. The project is scheduled to be completed by early December. This will include paving all 5 lanes from curb to curb including connections for approaches. Next summer the contractor will come back to perform a seal coat and re-striping.
Monday(November 2, 2026) had no paving as the project site was not ready to be paved due to the rain we received over the weekend that saturated the ground with water. Paving started again on Tuesday Nov. 3 and will continue every day that weather allows, and no other unforeseen issues arise. The contractor is planning to continue paving the north portion of SH-34. If everything goes well, traffic will shift onto this new pavement by this weekend when they plan to start paving the south portion of the road.”
I have had many in the community voice their concerns and frustrations regarding the project and have done my best to relay them to ITD staff. ITD shared a link to their website where project updates will be maintained. Visit the site at:
https://itd.idaho.gov/project/soda-springs-us-30-road-reconstruction/
While times of inconvenience can be frustrating, I am confident that once the project is complete, the Soda Springs community will be pleased with work done.
Thank you,
Paul Gritton
City of Soda Springs Mayor