Berrylands Nature Reserve

Berrylands Nature Reserve Nestled in the heart of Berrylands is a forgotten five-hectare nature reserve & this project aims to revitalise it back to a thriving local nature reserve!
(1)

This is an amazing opportunity for the local community to be involved with transforming a relatively neglected local green space into an even more biodiverse local site which is accessible for everyone to visit and learn from. Berrylands Nature Reserve is officially recorded as being called Raeburn Open Space Local Nature Reserve (LNR) and was declared an LNR by Natural England in 1992. Find out more about our project on this page or at the Environment Trust website listed below.

Berrylands Nature Reserve   - 1st photo - empty on 26th July 26 , refilled on 28th July to top water level, 2nd and 3rd ...
06/08/2026

Berrylands Nature Reserve - 1st photo - empty on 26th July 26 , refilled on 28th July to top water level,

2nd and 3rd photos taken today 6th Aug at 12:00 hrs - note the reduction in water level by approx 30 cms ( evaporation with effectively zero rainfall )

Zoom in on photo 2 to see the wet clay tide mark on the left of the photo - level decline over 9 days - an effective marker for the current drought conditions with yet another heat wave forecast for next week. 😢😢

Berrylands Nature Reserve stalwarts - Celia, Paul and Steve refilling the pond, clearing balsam from the stream and path...
30/07/2026

Berrylands Nature Reserve stalwarts - Celia, Paul and Steve refilling the pond, clearing balsam from the stream and pathways through the woodland - great team work@

Approximately 7 weeks ( 6th June 26 - 28th July ) between Photo 1 and Photo 5 where the     had evaporated to dryness - ...
30/07/2026

Approximately 7 weeks ( 6th June 26 - 28th July ) between Photo 1 and Photo 5 where the had evaporated to dryness - refilled by our industrious pumping from the Tolworth Brook.
Photo 3 taken on 26th July 2026 with the Waterlily providing much need cover from the intense heat and sunshine

Kay and Paul clearing paths for better access in and onto the BNR
02/07/2026

Kay and Paul clearing paths for better access in and onto the BNR

Always amazed what you find during a Balsam Bashing session along the Tolworth Brook which flows through the BNR Thanks ...
01/07/2026

Always amazed what you find during a Balsam Bashing session along the Tolworth Brook which flows through the BNR
Thanks to Reuben for his assistance to secure the dislodged coping stone on the Berrylands Park bank and lift out the exercise bike which someone had dumped in the Brook.
Some gigantic Balsam plants found and removed but on a miniature scale Reuben spotted a newly emerge tiny froglet on the side of the pond
Small but industrious team also cleared pathways through the reserve

Photo to illustrate the flashy nature of the Tolworth Brook flowing through the   following the thunderstorms and torren...
29/06/2026

Photo to illustrate the flashy nature of the Tolworth Brook flowing through the following the thunderstorms and torrential rain during the record breaking temperatures of June 2026.
Photo taken on 28th June 2026
The high water level and torrential flow has flattened bankside reeds growing beside the river bank just upstream of the ford
Estimated a 1 meter increase in depth - This dramatic increase in depth and flow is typical of an urban river catchment where roads and concrete prevail

Before and after photos of the    to illustrate the evaporation impact of the recent record high temperatures  Top water...
29/06/2026

Before and after photos of the to illustrate the evaporation impact of the recent record high temperatures
Top water level after refilling in photo 1 in 6th June - 22 days later Photo 2 - 28th the water level has declined by approx 30-40 cms though the Waterlily has grown well and producing flower buds

So pleased to report via a sequence of photos of today’s refilling of the     pond with the fresh water pumped from the ...
06/06/2026

So pleased to report via a sequence of photos of today’s refilling of the pond with the fresh water pumped from the adjacent Tolworth Brook.
Pumping started at 11:05 am and after approx. 1hr 45mins of continuous steady pumping the Pond was refilled with the overflow operating as top water level at 12:48 pm
Great work by all and so satisfying to achieve our plans come to fruition.
Photo 1 , pumping started
Photo 6, TWL achieved ✔️
Photo 7, Flow into the overflow ✔️

The   now at extreme low level withe the   providing a refuge for the   Hopefully it can be refilled asap pending flow i...
31/05/2026

The now at extreme low level withe the providing a refuge for the
Hopefully it can be refilled asap pending flow in the adjacent Tolworth Brook

For 2026 it’s   season once again, this invasive plant species grows throughout the Hogsmill catchment.  volunteers have...
19/05/2026

For 2026 it’s season once again, this invasive plant species grows throughout the Hogsmill catchment. volunteers have been meeting over the past 6/7 years to pull and remove the growing plants - a great way to meet new friends and contribute to the control of this insidious plant - dates and details as in the post - all welcome

Address

Raeburn Open Space, Elmbridge Avenue, Surbiton
London
KT59EE

Alerts

Be the first to know and let us send you an email when Berrylands Nature Reserve posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organisation

Send a message to Berrylands Nature Reserve:

Shortcuts

Share