Colorado Department of Transportation

Colorado Department of Transportation CDOT builds and maintains interstates and highways (no local or residential roadways), and supports other modes. Safety is our top priority.

Our goal: To provide the best, safest and most effective multi-modal transportation system for Colorado. Thank you for engaging with CDOT on our page. Please note that we do not allow external posts, so if you need to reach us directly, send us a Facebook Message or contact us through the Contact Us link on www.COdot.gov. We encourage Colorado residents and our guests to be respectful of one another's perspectives, opinions, and feelings. Please note that comments that go against our rules of engagement listed below will be deleted.
- Obscenity or profanity (language that the average person would find offensive, such as comments that include expletives or crude or vulgar words)
- Libelous comments (false statements that damage someone’s reputation)
- Fighting words (statements that tend to incite an immediate breach of peace and are directed at a CDOT employee or employees)
- Threats (statements communicating an intent to commit an act of violence)
- Comments that appear to incite or further illegal or criminal activity
- Commercial speech (advertising for a business with the intent of gaining revenue)

✅PROJECT COMPLETE✅| New I-25 auxiliary lanes improve safety and traffic flow in Colorado SpringsCrews have substantially...
09/30/2026

✅PROJECT COMPLETE✅| New I-25 auxiliary lanes improve safety and traffic flow in Colorado Springs

Crews have substantially completed improvements along I-25 between Fillmore Street and Garden of the Gods Road in Colorado Springs.
In addition to the added lanes, the project included resurfacing I-25, curve slope adjustments to improve roadway drainage, the addition of concrete median barrier, and several safety-critical bridge improvements, including the reconstruction and widening of the I-25 bridges over Ellston Street and repairs to the bridge deck on the Garden of the Gods Road overpass.

The intelligent transportation system infrastructure was upgraded, including fiber optics and ramp-metering equipment. These improvements allow traffic conditions to be monitored and help adjust ramp-meter timing to better manage traffic flow and reduce backups.

📰Full story: https://www.codot.gov/news/2026/september-2026-news/coloradosprings-i25-auxiliary-lanes-complete

✅PROJECT COMPLETE✅| Diverging diamond interchange at CO 21 Powers Boulevard and Airport Road in Colorado SpringsThe new ...
09/30/2026

✅PROJECT COMPLETE✅| Diverging diamond interchange at CO 21 Powers Boulevard and Airport Road in Colorado Springs

The new configuration, which carries Airport Road traffic over Powers Boulevard, has already improved mobility and reduced congestion. Periodic lane closures and traffic shifts are expected through October as crews complete the remaining work.

The DDI design will address congestion, improve safety and add multimodal facilities that provide a safer, more comfortable travel experience for motorists, pedestrians and cyclists. Similar interchanges have been constructed at Fillmore Street and I-25, Research Parkway and Powers Boulevard, and several other locations across Colorado.

📰Full Story: https://www.codot.gov/news/2026/september-2026-news/co21-powers-airportroad-diverging-diamond-interchange-complete

City of Colorado Springs

⚠️TRAVEL ALERT⚠️ | Full closures of I-25 E. Frontage Road south of WCR 32 on 10/1/2026Crews will temporarily close the I...
09/30/2026

⚠️TRAVEL ALERT⚠️ | Full closures of I-25 E. Frontage Road south of WCR 32 on 10/1/2026

Crews will temporarily close the I-25 E. Frontage Road, south of Weld County Road 32, starting Thursday (10/1) at 7 a.m., through Friday (10/9) at 5 p.m.

Crews will mill, grade, repave and stripe both lanes of the Frontage Road between WCR 32 and Camelot Circle. Access to nearby businesses will be maintained, and viable detour routes and speed limit reductions will be posted. Please note that construction is site- and weather-dependent, which may impact construction operation and duration.

📰More info: https://www.codot.gov/news/2026/september-2026-news/i25-eastfrontageroad-wcr32-full-closure-begin-oct1

📢PROJECT NEWS📢 | Fairplay Mobility Hub improvements project has begun🗺WHERE?  The project is located on Colorado Highway...
09/29/2026

📢PROJECT NEWS📢 | Fairplay Mobility Hub improvements project has begun

🗺WHERE? The project is located on Colorado Highway 9 (Main Street) at Mile Point 65.3 where it intersects with 4th Street.

🚜WHAT? The project will include construction of a new transit stop with bus loading and unloading areas, a passenger waiting zone, ADA-compliant sidewalks and ramps, a new parking lot, internal circulation improvements, and associated drainage and lighting infrastructure. Work is expected to be completed late 2026.

⚠️TRAVEL IMPACTS: Working hours from 7 a.m. to 5 p.m., Monday through Thursday and 7 a.m. to noon on Fridays. Various shoulder closures and some single lane closures will be in place within the work zone. Motorists are urged to drive with caution, heed all signs and leave plenty of following distance when traveling through the area. Construction schedules could change depending on the weather.

🌐More info: https://www.codot.gov/news/2026/september-2026-news/fairplay-mobility-hub-started-september

⚠️TRAVEL REMINDER⚠️ | CMV Must Carry Law is active statewide It might still feel like summer in certain parts of  , but ...
09/29/2026

⚠️TRAVEL REMINDER⚠️ | CMV Must Carry Law is active statewide

It might still feel like summer in certain parts of , but winter weather is around the corner. September marks the beginning of Must Carry Chain Law season, when all CMV drivers must carry chains or an approved alternative traction device from Sept. 1 to May 31.

Truck drivers: Load up your chains to avoid fines and help keep everyone safe on Colorado roads.

🌐 For more information about chaining up in Colorado, visit bit.ly/ChainUpTips
📲 Check COtrip.org for chain-up stations

The National Weather Service forecast calls for snow and high winds to impact much of central Colorado beginning Tuesday night (11/5). A cold front will enter the state overnight with driving winds and the potential for blowing snow and icy conditions. Impacted areas include I-25 from south of Denve...

📆MARK YOUR CALENDAR 📆 |  I-270 Corridor Improvements Telephone Town HallPlease join us on Tuesday (10/6/2026) from 6 to ...
09/28/2026

📆MARK YOUR CALENDAR 📆 | I-270 Corridor Improvements Telephone Town Hall

Please join us on Tuesday (10/6/2026) from 6 to 7 p.m. MST for a telephone town hall to review major milestones on the I-270 Corridor Improvements project. The call will include information on the Final Environmental Impact Statement and Record of Decision, upcoming public outreach and the next steps for construction.

📲Join by dialing 855-756-7520, Ext.135813 # from your cell phone or landline. English and Spanish-speaking services will be provided.

ℹTo learn more, visit bit.ly/I270improvements.

You are here: Home Projects Studies I-270 Corridor Improvements Study Quick Links Final Environmental Impact Statement and Record Of Decision (FEIS/ROD) & State Environmental Reports Draft Environmental Impact Statement (DEIS) & State Environmental Reports Related Projects & Studies Public Outreach....

Just like home maintenance or changing your oil, keeping a multi-ton highway structure safe takes constant attention and...
09/28/2026

Just like home maintenance or changing your oil, keeping a multi-ton highway structure safe takes constant attention and preventive care. 🛠️

Enter our Bridge Preventive Maintenance crews. These teams hang under mountain highways, work above rushing waters, and use engineering and ingenuity to add decades of life to Colorado's 3,400+ bridges. It’s an adrenaline-fueled job that keeps you safely connected. 🧡

⚠️TRAVEL ALERT⚠️ | I-70 Floyd Hill near Idaho Springs 🔸Tonight, Sept. 27, crews will conduct two traffic shifts on westb...
09/27/2026

⚠️TRAVEL ALERT⚠️ | I-70 Floyd Hill near Idaho Springs

🔸Tonight, Sept. 27, crews will conduct two traffic shifts on westbound I-70. Crews will shift westbound I-70 east of Hidden Valley (Exit 243), north toward the outside shoulder to complete construction in the median area, and crews will shift westbound I-70 west of Hidden Valley (Exit 243) north onto the newly completed bridge over Clear Creek to complete construction in the median area. For more information, view our project update below!

🔸8 p.m. to 6 a.m., Sunday, Sept. 27, through Thursday, Oct. 1 - Expect overnight, single-lane closures on westbound I-70 between US 6 (Exit 244) and Idaho Springs (Exit 241) for traffic shifts, barrier set and signage removal.

🔸 8 a.m. to 6 p.m., Monday, Sept. 28 - Expect an overnight, right-lane closure on eastbound I-70 between US 6 (Exit 244) and Hidden Valley (Exit 243) for crews to set barrier.

🔸7 a.m. to 5 p.m., Tuesday, Sept. 29, through Thursday, Oct. 1, and 9 a.m. to 2 p.m., Friday, Oct. 2 - Expect daytime, right-lane closures on eastbound I-70 between Hidden Valley (Exit 243) and US 6 (Exit 244) for bridge construction.

🔸6 p.m. to 6 a.m., Sunday, Sept. 27, and Monday, Sept. 28, and 9 a.m. to 3 p.m., Monday, Sept. 28 - Expect overnight closures and a daytime closure of the Hidden Valley on-ramp to westbound I-70 (Exit 243) to shift traffic.

🔸6 p.m. to 6 a.m., Sunday, Sept. 27 - Expect an overnight closure of the westbound I-70 off-ramp to Hidden Valley (Exit 243) to shift traffic.

🔸9 a.m. to 3 p.m., Tuesday, Sept. 29, and Thursday, Oct. 1 - Expect daytime closures of the westbound I-70 off-ramp to US 6 (Exit 244) for bridge construction.

🔸9 a.m. to 3 p.m., Tuesday, Sept. 29 - Expect a daytime closure of the eastbound I-70 off-ramp to Hidden Valley (Exit 243) for construction work.

🔸In early-to-mid October, motorists can expect two overnight, westbound I-70 closures at US 6 (Exit 244) for segmental bridge construction. The overnight full closures of westbound I-70 at US 6 (Exit 244) are currently scheduled for 9 p.m. to 5 a.m., Sunday, Oct. 11, and Monday, Oct. 12. For more information, view our project update below.

🔸For more information on the project and upcoming impacts, please view our Project update: https://mailchi.mp/state/i-70-floyd-hill-project-update-09-27

All work is weather-dependent and subject to change.

For additional information on these impacts, sign-up for our weekly project email: https://subscription.cotrip.org/

by signing up for text alerts by texting floydhill (one word) to 21000.

More info: codot.gov/projects/i70floydhill

✅PROJECT COMPLETE✅| Resurfacing of US 160 west of WalsenburgThe project improved approximately 11 miles along US 160 wes...
09/26/2026

✅PROJECT COMPLETE✅| Resurfacing of US 160 west of Walsenburg

The project improved approximately 11 miles along US 160 west of Walsenburg from the US 160/CO 12 intersection to near Main Street in Walsenburg. Roadway work included milling old asphalt, paving with new asphalt, bridge deck repairs, road sign replacement, updated pavement marking and striping.

Work began April 6 and was completed late September.

📰More info: https://www.codot.gov/news/2026/september-2026-news/us160-west-walsenburg-resurfacing-complete

Address

2829 W. Howard Place
Denver, CO
80204

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 4:30pm

Telephone

+13037579011

Alerts

Be the first to know and let us send you an email when Colorado Department of Transportation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share