State University Construction Fund

State University Construction Fund The Fund is a public benefit corporation whose mission is to act as an agent for SUNY to design, construct, acquire and improve SUNY facilities.

08/04/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. State University Construction Fund.

SUNY Purchase – Project 291134-01. Renovate Mechanical Systems Neuberger Museum.

The work of this single-bid project includes the renovation and repair of existing HVAC systems to improve temperature and humidity stability at the Neuberger Museum. Work includes a new chiller and building-wide generator adjacent to the Visual Arts South Building, utility routing through lawn and utilidor areas, and electrical upgrades within Visual Arts South, including modifications to the main distribution board, a new automatic transfer switch (ATS), distribution panel, and load center to support the new mechanical systems.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd
Or visit the New York State Contract Reporter: https://tinyurl.com/22je925j

07/30/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. State University Construction Fund.

SUNY Albany – Project 011045-02. Rehabilitate Physical Education Building – Basement, First Floor and Site Work.

The work of this single-bid project includes gut renovations of the basement, first floor, and rooftop mechanical penthouse of the Physical Education Building, including expansion of the penthouse. Exterior improvements include replacement of entry doors and numerous windows, precast concrete cleaning, and sealant joint replacement. Site work includes creation of a dedicated chilled water plant and an area for modular structures. Hazardous material abatement is included as part of the construction scope.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd

or visit the New York State Contract Reporter: https://tinyurl.com/yckbst9s

07/29/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. State University Construction Fund.

SUNY Binghamton – Project 071099-00. Replace Storefront and Exterior Doors – Bartle Library, University Union, and Couper Administration Building.

The work of this single-bid project includes replacing existing storefront systems in their entirety, including aluminum framing, entrance doors, door hardware, and glazing at multiple campus locations. The project also includes modifications and reconnections to card access, security, and related building systems, construction of a new vestibule at the rear entrance of the Couper Administration Building, and associated architectural, structural, and systems integration work. Hazardous material abatement is also included.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd

or visit the New York State Contract Reporter: https://tinyurl.com/2uhz7bbc

07/29/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. State University Construction Fund.

SUNY Maritime – Project 211057-00. Replace Steam Boilers 3 & 4 – Physical Plant.

The work of this single-bid project includes the furnishing and installation of two new high-pressure steam fire-tube boilers within the campus heating plant, along with associated steam, condensate, feedwater, fuel oil, compressed air, and liquified petroleum gas piping systems. The project also includes installation of new plant master controls and monitoring systems, a temporary steam boiler to maintain operations during construction, hazardous materials removal, combustion air fans, exhaust stacks, and replacement of direct-buried city water piping serving the heating plant.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd

or visit the New York State Contract Reporter: https://tinyurl.com/2m9jvzdj

07/29/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. State University Construction Fund.

SUNY ESF – Project 201049-01. Renovate Illick Hall – Renovate Baker Hall West Wing.

The work of this single-bid project includes the interior demolition of approximately 14,000 square feet of existing laboratory and office space and the construction of new laboratories, offices, and support spaces within Baker Hall West Wing. Work also includes new electrical, plumbing, HVAC, fire protection, fire alarm, and IT systems, as well as new walls, doors, and finishes for a complete interior renovation of the space.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd

or visit the New York State Contract Reporter: https://tinyurl.com/54e4musk

07/27/2026

Career Opportunity: The Fund is searching for an Associate Project Coordinator (Mechanical Engineer) to join our Design & Construction team in Albany, NY. This role will review engineering designs for code compliance, support construction projects, solve technical challenges, evaluate new systems and technologies, and help shape SUCF design standards and directives.
Are you a good fit? Explore the full job posting here: https://tinyurl.com/3rmu2xcm

07/27/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. State University Construction Fund.
SUNY Potsdam – Project 121058-00. Renovate Crane Complex Entrances.
The work of this single-bid project includes the renovation of approximately 10,000 square feet within the Crane Complex at SUNY Potsdam. Renovations will take place across Homer, Snell, Bishop, and Schuette Halls and include asbestos abatement, structural steel, masonry, miscellaneous metals, railings, carpentry, thermal protection, doors and hardware, aluminum storefronts and entrances, finishes, acoustic wall panels, ceilings, partitions, flooring, restroom accessories, signage, and minor site work. The project also includes mechanical, electrical, plumbing, and fire protection upgrades.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd
or visit the New York State Contract Reporter: https://tinyurl.com/r436722p

07/27/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. State University Construction Fund.
SUNY Polytechnic – Project 391025-00. Renovate Kunsela Hall for STEM Education and Workforce.
The work of this single-bid project includes partial interior renovations to Kunsela Hall to update and expand instructional, laboratory, and support spaces for growing STEM education programs. Renovations include a mix of medium- and low-intensity rehabilitation work, classroom and laboratory fit-outs, bathroom upgrades, new LED lighting, reconfigured power and receptacle layouts, localized HVAC controls improvements, and upgrades to HVAC terminal devices and exhaust fans. The project also includes extending the building’s fire sprinkler system into renovation areas that are not currently sprinklered.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd
or visit the New York State Contract Reporter: https://tinyurl.com/4rx9wted

07/07/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. State University Construction Fund
SUNY Morrisville – Project 271080-00. Replace Boilers and Steam Piping Central Heating Plant.
The work of this single-bid project includes furnishing and installing two new 500HP high-pressure steam firetube boilers to replace existing boilers in the central heating plant, along with upgrades to campus steam and heating distribution systems. Work includes replacement of steam distribution piping serving Bicknell Hall, East Hall, Shannon Hall, and Galbreath Hall with new direct-buried steam piping, replacement of existing steam manhole MH-1, and conversion of the distribution system serving Oneida Hall, Mohawk Hall, and Cayuga Hall from steam to low-temperature water (LTW) service, including installation of an LTW heat exchanger, distribution pump, and associated direct-buried LTW piping originating at Galbreath Hall.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd
or visit the New York State Contract Reporter: https://tinyurl.com/bdh26pbd

Demolition has begun on the parking garage at SUNY Downstate, marking a major step forward following years of structural...
06/24/2026

Demolition has begun on the parking garage at SUNY Downstate, marking a major step forward following years of structural challenges. Work is now underway, with demolition and debris removal progressing over the coming months.
Clearing the site will pave the way for the Hospital Annex Project (Project 141223), a $500M investment that will transform this location.
Work is being carried out in coordination with Russo Development Enterprises, Inc. (Contractor), Marvel Architects, PLLC (Consultant), LiRo-Hill (Construction Manager), SUNY Downstate, and SUCF.

Address

353 Broadway
Albany, NY
12246

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when State University Construction Fund posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share