Alaska Department of Transportation & Public Facilities

Alaska Department of Transportation & Public Facilities Our mission is to Keep Alaska Moving. Learn more at dot.alaska.gov Alaska DOT&PF's mission is to "Keep Alaska Moving."

We oversee 237 airports, 10 ferries serving 33 communities along 3,500 marine miles, over 5,600 miles of highway and 839 public facilities throughout the state of Alaska. See the Alaska DOT&PF Social Media Policy at http://dot.alaska.gov/social_media.shtml

We are committed to our Nondiscrimination Policy Statement: https://dot.alaska.gov/tvi_statement.shtml

Happy LABOR DAY! As we head into the long weekend, we’re sending a huge THANK YOU to our dedicated employees across this...
09/04/2026

Happy LABOR DAY! As we head into the long weekend, we’re sending a huge THANK YOU to our dedicated employees across this beautiful state. The labor, commitment, and skills of this hard-working team are essential in keeping Alaskans and visitors moving around one of the most unique & challenging places on Earth.

Photo: Paving into the evening on the Alaska Highway near Tok, September 2022. By Chris Plutt, Alaska DOT&PF

09/04/2026

Skagway Ferry Terminal Repair Update September 4, 2026:

Taking a break from🎶 working 9 to 5 🎶this holiday weekend? Plan ahead to make sure you’ve got a safe ride home! This Lab...
09/04/2026

Taking a break from🎶 working 9 to 5 🎶this holiday weekend? Plan ahead to make sure you’ve got a safe ride home!

This Labor Day weekend, don’t let a night out turn into a DUI. Designate a sober driver, call a friend, or use a taxi or rideshare.

Whatever you choose, never drive impaired. Help keep Alaska’s roads safe for everyone.

📣 We want to hear from you about College Road! Alaska DOT&PF, in cooperation with Fairbanks Area Surface Transportation ...
09/03/2026

📣 We want to hear from you about College Road!
 
Alaska DOT&PF, in cooperation with Fairbanks Area Surface Transportation (FAST) Planning, is asking the community to share their thoughts on a proposed restriping project on College Road between Margaret Avenue/Antoinette Avenue and University Avenue.

The proposal would include one lane in each direction and a center two-way-left-turn lane to help drivers access nearby driveways, businesses and side streets.
 
📝 Take the survey and tell us what you think:
https://survey123.arcgis.com/share/2eecdf99403e4069bcc0074e381b1daf
 
The survey closes September 30 at 11:59 p.m.
 
Learn more about the project:
https://dot.alaska.gov/nreg/college-twltl/
 
Your feedback matters and will help us understand how the proposal could affect people who live, work and travel along College Road.
 

🚧 SEWARD HIGHWAY / PATHWAY WORK Non-motorized pathway users should expect temporary closures while crews complete pathwa...
09/03/2026

🚧 SEWARD HIGHWAY / PATHWAY WORK

Non-motorized pathway users should expect temporary closures while crews complete pathway improvements along the Seward Highway between milepost 90-99.

📅 Scheduled pathway work:
• Today (Sept. 3)
• Sept. 8–11
• Sept. 14–18

⏰ Temporary closures: 7:30 a.m.–7:30 p.m.

A shuttle will be available to transport pathway users from one end of the active work zone to the other during work hours.

Meanwhile, highway milling and paving will continue during the night shift. Please use caution around crews and equipment, and plan for additional time when traveling through the area. Please remember that all work is weather dependent and subject to change.

Always check 511.alaska.gov for most current information.
Alaska Department of Natural Resources

09/03/2026

What are those weather stations along Alaska’s highways?
 
They’re part of DOT&PF’s Road Weather Information System (RWIS), and they do much more than measure temperature.
 
RWIS stations can collect information about:
• Pavement temperature and conditions
• Pavement grip, which helps indicate how slippery the road may be
• Air temperature and humidity
• Wind and precipitation
• Snow depth and other weather conditions
• Roadway conditions through cameras
 
Some pavement sensors can also measure conditions below the road surface.
 
This real-time information helps maintenance crews decide when and where to deploy people and equipment. It supports efficient winter maintenance and helps reduce travelers’ exposure to hazardous road conditions.
 
To learn more about RWIS, visit our website: https://roadweather.alaska.gov/gis
 

On this day in 1935, the first bridge connecting Douglas Island with Juneau unofficially opened. In the early morning of...
09/02/2026

On this day in 1935, the first bridge connecting Douglas Island with Juneau unofficially opened. In the early morning of September 2, 1935, the first car crossed the nearly-completed bridge. It contained eight Douglas friends, including Douglas mayor, A.E. Goetz. Juneau mayor, Izzy Goldstein, hosted the group for breakfast after the crossing. The official opening of the 66.4 ft. Juneau-Douglas Bridge took place on October 13, 1935.

O.H. Stratton designed the bridge, and Ike Taylor was its chief engineer; both worked for the Alaska Road Commission (now Alaska DOT&PF). The bridge, funded primarily by federal New Deal programs, cost around $250,000.

Prior to the bridge’s construction, residents would either row across Gastineau Channel or use a triangular ferry service operated from Douglas to Juneau to Thane.

Photos: Juneau-Douglas Bridge, 1935. Courtesy of the Alaska State Library - Historical Collections

Roadside Inspector, Oscar, doesn't "kid" around about Work Zone safety! 🐐🦺 Here's his quiz for you: Which months of Alas...
09/01/2026

Roadside Inspector, Oscar, doesn't "kid" around about Work Zone safety! 🐐🦺 Here's his quiz for you: Which months of Alaska's construction season tend to have the highest reported work zone crashes?
A) April & May
B) June & July
C) August & September
D) October & November

🔶 Alaska’s work zone crews sure appreciate safe, patient drivers who are focused and slow their roll. (see correct answer in the first comment)

09/01/2026

🚢 Skagway Ferry Terminal update (August 31, 2026)

🚧 Scheduled Dalton Highway CLOSUREThe Dalton Highway will be closed from 8 a.m. to 8 p.m. on Thursday, September 3 at MP...
08/31/2026

🚧 Scheduled Dalton Highway CLOSURE

The Dalton Highway will be closed from 8 a.m. to 8 p.m. on Thursday, September 3 at MP 314.5 to 316 due to a culvert replacement.

Motorists can expect continued single-lane traffic and 24-hour flagging operations between MP 314.5 and MP 316. Please plan ahead, use caution around crews and equipment, and thank you for your patience while this work is underway.

For current road conditions, visit 511.alaska.gov or download the Alaska 511 app.

Address

3132 Channel Drive
Juneau, AK
99811

Alerts

Be the first to know and let us send you an email when Alaska Department of Transportation & Public Facilities posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share